CONSTRUCTION PROGRESS UPDATE
 
Symphony Honolulu is pleased to announce that the construction of the residential tower is 20 stories and climbing!

Based on a concrete pour cycle of one residential floor per week, the tower is expected to rise skyward to 400 feet by the end of Summer 2015. Tower glazing installation has commenced and glazing is installed through level 12, lagging the concrete floor pours by 6 floors.

Vertical concrete construction of JN Group Inc.'s Velocity luxury auto galleria has been completed through Level 4. Symphony's podium structure will continue to rise concurrent with the tower, with the final concrete pour of Symphony grand terrace amenity level 7 scheduled in May 2015.
 
 
 
 
 
 
The total concrete poured at Symphony could fill 13 Olympic swimming pools.
If you were to stretch all the post-tension cabling used at Symphony, you could zip line from Kauai to the Big Island (296 miles).
There is 17 miles of wood base on the Symphony project. Enough to lay baseboard along the roadway from the jobsite to Waimanalo around Koko Head.
Enough paint used to paint Aloha Stadium football field 56 times.
 
 
Symphony Honolulu Sales Gallery
at INspiration in the Honolulu Design Center
1250 Kapiolani Boulevard, 3rd Floor,
Honolulu, Hawaii 96814

Open Daily from 10:00 a.m. - 5:00 p.m.
 
808.596.8688
 
info@symphonyhonolulu.com

Two and three bedroom residences still available!
Symphony Website
OliverMcMillan Website
 
Exclusive Project Broker: Heyer & Associates, LLC
Courtesy to qualifying brokers; see project broker for details.
 
The photos and computer renderings shown and included in this email are for illustrative purposes only and are not intended as a warranty or representation by the developer. The developer hereby disclaims any representation, warranty or assurance to a prospective buyer regarding the size, height, location or composition of any improvement to be constructed on the project as depicted in this email and the developer reserves the right to substitute the materials, appliances and other items in the units and the project with materials, appliances and other items of substantially equal quality and utility. These substitutions may include kitchen appliances, household fixtures, electrical outlets and switches, hardware, wall surfaces, painting and other similar items. The developer is not constructing any unit specifically for a buyer, nor to the precise specifications or design of any rendering or other preliminary plans which may be shown or depicted in this email or otherwise. Rather the developer is constructing each unit as part of the project. Any unit or floor plan in the project depicted in this email is shown only for illustration and developer is not required to deliver a unit in exact accordance with any unit or floor plan so depicted. The landscaping and certain portions of the surrounding areas which are shown in the computer or artistís rendering in this email include in some instances a depiction which shows mature landscaping and intentionally omits the neighboring unit or units for illustrative purposes only and does not reflect how the actual project landscaping will look when it has gained maturity or the lack of neighboring units. None of the appurtenances and furnishings shown or depicted in any unit in this email is included with a unit unless expressly provided under the sales contract with a prospective buyer. The usable or living area, location and configuration of the units and all other improvements of the project may fluctuate from that shown or depicted in this email or any other drawings or plans when the developer finally places all of the improvements on the site pursuant to the approved construction drawings.
 
NOTICE: Obtain the Property Report required by Federal law and read it before signing anything.
No Federal agency has judged the merits or value, if any, of this property.
2015 © Symphony Honolulu. All Rights Reserved.
 
Having trouble viewing this email? Click here.